• fr
  • de
  • en
NewTechResentra : terrassement, dépollution et curage par aspiration
NewTechResentra : terrassement, dépollution et curage par aspiration
La technique de l'aspiratrice excavatrice pour allier efficacité, économie et écologie au service du BTP et de l'industrie
  • NewTechResentra
    • Company
  • Our services
    • Work in an urban environment
    • Industrial and petrochemical sites
    • Refineries and filling stations
    • Special suction and blowing operations
    • Railway maintenance
    • Work in confined spaces
  • Technical aspects
  • Certification
  • Hiring
    • Our suction-excavator fleet
    • Hire of equipment
  • References
    • Case studies by site type
    • Clients who have chosen to work with us
  • Contact
MENU CLOSE back  
TU_Terrassement_Fuite
PrevNext

Excavation to search for leak

Town/City: Colmar

Department: Haut-Rhin

Region: Alsace

Country: France

 

30 December 2014Work carried out in an urban environment

Projets similaires

  • Excavation between two buildings with mini-digger connected to suction-excavator

    Excavation between two buildings with mini-digger connected to suction-excavator

    Details
  • Excavation and asphalt breaking

    Excavation and asphalt breaking

    Details
  • Renewal of water pipe in city centre

    Renewal of water pipe in city centre

    Details
  • Excavation of a trench in a rear courtyard with a remote-controlled machine

    Excavation of a trench in a rear courtyard with a remote-controlled machine

    Details
  • Production of trench for renewal of water networks – Narrow road

    Production of trench for renewal of water networks – Narrow road

    Details
  • Production of a trench (with no network) using rotary hydraulic tube

    Production of a trench (with no network) using rotary hydraulic tube

    Details
NewTechnologyBTP Logo
6 chemin du Langeren
F-68140 SOULTZEREN
Tél. : +33 (0)3 89 77 90 80
Mail : contact@newtechbtp.com

  • Travaux urbains
  • Industrial and petrochemical sites
  • Refineries and filling stations
  • Special suction-blowing work
  • Railway track maintenance
  • Work in confined spaces
TMC_Curage_Galerie_Sable RSC_Creation_Trous_Esso SLIDE_TS_Aspiration_Grand_Flexible TS_Aspiration_Scories_1 TS_Aspiration_Feuilles_1 TS_Vide_Sanitaire_Particulier TS_Aspiration_Sable_Tubage_1 TS_Aspiration_Sable
Agence Sud-Est
29, avenue José Nobre
F-13500 MARTIGUES
Tél. : +33 (0)6 71 69 68 83
Mail : contact@newtechbtp.com

Cookies - Mentions légales - © Copyright Eurhode Communication 2014